(Solved) : System Operating Time 10 000 Hours Mtbf 250 Hours Corrective Maintenance Two Technicians A Q34256231

$ 7.00

Answer to A system has an operating time of 10,000 hours. Its MTBF is 250 hours. For each corrective maintenance, two technicians …

SKU: d38eaa9c6d3f Category:

Description

A system has an operating time of 10,000 hours. Its MTBF is 250hours. For each corrective maintenance, two technicians have beenassigned. The Mean Corrective Maintenance Time is 2 hours. a)Calculate the number (quantity) of corrective maintenance actions.b) Calculate MLH/OH (Maintenance Labor Hour per Operating Hour)